Bentley Bridge, Wolverhampton

Roseneath Estates Ltd
Maber Project Planning
HSP Consulting 

£3.2m

 The Bentley Bridge scheme is Phase 2 of a major multi use development Park for Developer, Clowes Developments Ltd in Wednesfield, Wolverhampton.

Currently there is an Existing Terrace of industrial units occupied by an eclectic group of tenants, built in 2009 / 2010 and located in the South East corner of the site.

Phase 2 consists of a Terrace of 6 industrial units, located within a 1.9 acre site, mirroring that of Phase 1.The site has dedicated parking to the front elevation with landscaped areas abutting the surrounding highways.

In addition there is a new bespoke unit, located within 2.27 acres of land for Bally Vassey, Mercedes Benz.

The state of the art Unit comprises of Reception areas, offices, workshops, service and VOSPA inspection pits at Ground floor level. With office and welfare facilities to the 1st Floor mezzanine areas. Externally there is dedicated parking, external storage areas for heavy goods vehicles and vans, and a wash down area surrounded by landscaped areas abutting the surrounding Highways.
Share by: