Network 401, Brackley


Goring Berry LLP
Cornish Architects
Bailey Johnson H ayes

£7.9m

This project comprises the design and build construction of 2 industrial units totalling some 137,500ft2 which will be sub-divided into 8 individual units.

The development will include extensive site remodelling which will include the removal of 25,000 cubic meters of spoil to achieve the designed plateau level. A series of retaining structures and batters will allow the construction of these composite clad envelopes, on steel frames, on ring beam foundations with heavily reinforced ground bearing slabs, all which have been designed to eliminate the risk of settlement. Internally there are first floor, fully fitted out mezzanine offices above small stair cores and toilets. 

The project will also include all associated external , concrete yards, retaining walls, tarmac footpaths and drainage along with bypass interceptors. A comprehensive ducting installations for BT and cable suppliers, together with CCTV, signage and external lighting. There are extensive new services to the site, HV and LV power, a new substation, gas, water, BT and extensive landscaping.

This green field site, sits outside of the local flood plain and the drainage strategy encompasses hydrobrake technology, large diameter pipe runs, combined with a large volume water retention swale to allow the maximum water retention on site during storm conditions.

This contract was run using the principals of the Considerate Constructors Scheme
Share by: