Wrenbridge, Houghton Regis


KAM Project Consultants 
CMP Architects
SWECO Services UK Limited 
Scott White Hookins 
Mba Consulting Engineers 

£7.8m

This project comprises the design and build construction of 6 industrial warehouse units across 4 buildings including mezzanine floors with a full open plan office fit out ranging from 7,234 – 40,635sqft units circa 100,00sqft in total.

 

The development includes S278 access roadworks from Thorn Road to provide suitable HGV access to the site.


Earth works were undertaken to cut and fill the site to suitable levels and a period of ground improvement measures included ground stabilization. All arisings from the earthworks and groundworks were retained on the site and utilized in the designated landscaped and bunded areas to the adjacent care home elevation formed to accommodate this.

 

A new access road serves the units being constructed.

 

New gas, water and electric services were brought on site along with BT infrastructure ducting.

 

The buildings themselves are constructed with steel frames and a mixture of built up and composite cladding. The external works consist of concrete access roads, HGV yards and service areas, tarmac car parking bays with block paved footpaths.


This site achieved a 'Very Good' score with the Considerate Constructors and a BREEAM rating of 'Excellent'.